Customization: | Available |
---|---|
Appearance: | Liquid |
Main Raw Material: | Modified Chlorinated Rubber |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Design Usage |
Applicable scene |
Ship Waterline
|
Ship Hull
|
|
Superstructure and Power Plant
|
|
Steel Plant and Wharf Steel Structure
|
|
Chemical Plant | |
Bridge | |
Container |
Design Feature |
Product Composition |
Construction Parameter |
Item | Index | |
Density | About 1.20g/cm3 | |
Volume solid | 43±3% (after mixing) | |
Wet Film Thickness (WFT) | 50µm | |
Theoretical dosage | 150g/m2 | |
Actual dosage | Spraying | 260g/m2 |
Brushing | 200g/m2 | |
Drying Time | Natural drying (23ºC) | Surface drying ≤ 4h |
Actual Dry ≤ 24h | ||
Stoving (work-piece surface temperature is 70±2ºC) |
60min |
Re-coating Interval |
Shortest re-coating interval (23ºC) | 12h | ||
Longest re-coating interval | no limited |
Decorate Method |
Airless spraying | Nozzle Diameter | 0.4-0.5mm |
Ejection pressure | 12-15MPa (About 120-150kg/cm2) | |
Air Spraying | Nozzle Diameter | 2.0-3.0mm |
Air pressure | 0.3-0.6MPa (About 3-6kg/cm2) | |
Roller / Brush | Large area construction is not recommended. |
Matching Paint |
Front matching primer | Zinc-rich primer |
Epoxy iron red primer | |
Cloud iron intermediate paint |
Precautions |
Safety Matters |